Engineer Alaa Abdel-Latif Mostafa, Head of the 10th of Ramadan City Authority, conducted a comprehensive field tour of the industrial areas A1, A2, and A`1 to follow up on the progress of vital utility works. These include the implementation of potable water networks, sewage systems, and road leveling works in preparation for paving and comprehensive development.
The Head of the Authority also inspected the execution status of the strategic 900 mm diameter force main pipeline, which transports wastewater from the southwest of the city. This project is considered a key development supporting the city’s urban and industrial expansion, while also enhancing the overall efficiency of the sewage system.
During the tour, Engineer Alaa Abdel-Latif Mostafa emphasized the importance of adhering to the scheduled timelines and accelerating the pace of work, while maintaining the highest standards of quality in execution. He stressed the need for full coordination between the executing companies and the Authority’s engineers to ensure the best outcomes, in line with the state’s plan to upgrade infrastructure and provide an integrated and sustainable industrial environment.