Beta version open February 13

Completion of Road Development in Gardenia 2 Neighborhood, New Cairo

Engineer Abdel-Raouf El-Ghaiti, Head of the Development Authority for New Cairo City, announced the completion of asphalt paving in all roads within the Gardenia 2 neighborhood. A total of 18 roads have been completed, covering an area of 75,000 square meters, with road widths ranging from 10 to 11 meters and a total length of 7,142 meters. Additionally, curb and interlock work for pedestrian sidewalks has been finalized, with 46,250 meters of curbs installed and 52,500 square meters of interlock paving completed.

These projects align with the directives of Engineer Sherif El-Sherbiny, Minister of Housing, Utilities, and Urban Communities, to accelerate development and improve services for residents in new cities.

In parallel, Engineer El-Ghaiti met with representatives of residents from Gardenia Heights 1, 2, and 3 to discuss challenges they face and hear their suggestions and demands.

During the meeting, El-Ghaiti instructed officials to facilitate the procedures for connecting natural gas to residential units in Gardenia and to address any outstanding issues within the authority’s responsibilities. These efforts underscore the commitment to enhancing the quality of life for residents and advancing urban services in New Cairo.

Share:

Related Posts

Jun

06

Uncategorized

Granvia Mall New Capital Overview Granvia Mall is a significant addition to the New Administrative Capital of Egypt, featuring a

Jun

06

Uncategorized

Amara Residence New Cairo Compound stands out as a premier choice in the burgeoning real estate market of Egypt. This

Jun

06

Uncategorized

The Address East Compound in New Cairo, Egypt, exemplifies luxurious living with its modern design and world-class amenities. Developed by

Jun

06

Uncategorized

The Rock New Capital Mall represents a significant addition to Egypt’s New Administrative Capital, offering a modern shopping and leisure